BIG Reveals 20-Year Restoration Plan for Washington DC's Smithsonian Campus

Nearly a year-and-a-half since the announcement of their selection, BIG has unveiled plans for a massive, 20-year-long overhaul for the Smithsonian’s southern campus in the center of Washington DC. With an overarching goal to unite the site by dissolving the notable impediments and discontinuous pathways that plague the area, BIG plans to also expand visitor, education and gallery spaces, while updating aging and inefficient building systems.

"Where today each museum is almost like a separate entity, in the future, it’s going to be a much more open, intuitive and inviting campus to meander around," Bjarke Ingels explained.

BIG Reveals 20-Year Restoration Plan for Washington DC's Smithsonian Campus - Image 2 of 38BIG Reveals 20-Year Restoration Plan for Washington DC's Smithsonian Campus - Image 3 of 38BIG Reveals 20-Year Restoration Plan for Washington DC's Smithsonian Campus - ChairBIG Reveals 20-Year Restoration Plan for Washington DC's Smithsonian Campus - Image 5 of 38BIG Reveals 20-Year Restoration Plan for Washington DC's Smithsonian Campus - More Images+ 33

BIG Reveals 20-Year Restoration Plan for Washington DC's Smithsonian Campus - Image 6 of 38
Courtesy of BIG

The site – bordered by Jefferson Drive and the National Mall to the north, Seventh Street SW to the east, Independence Avenue SW to the south and 12th Street to the west – is home to some of the Smithsonian’s oldest buildings, including the 1855 Castle, which is the centerpiece of BIG’s proposal. Currently a visitor information center and headquarters for the Institution, the masterplan calls for a restoration of the historic Castle’s Great Hall with a direct access to the Enid A. Haupt Garden and the underground Ripley Center. 

"We're hoping to shift the paradigm away from administration and toward the visitor experience," said Smithsonian secretary Wayne Clough. "The enhancements really focus particularly on public access." 

BIG Reveals 20-Year Restoration Plan for Washington DC's Smithsonian Campus - Image 8 of 38
Courtesy of BIG

Directly in front of the Castle, the corners of the Haupt Garden will be peeled up to reveal the underground Sackler Gallery and National Museum of African Art. The gallery space in both museums will be increased by 30 percent and illuminated by new skylights outlining the garden.

BIG Reveals 20-Year Restoration Plan for Washington DC's Smithsonian Campus - Chair
Courtesy of BIG
BIG Reveals 20-Year Restoration Plan for Washington DC's Smithsonian Campus - Image 16 of 38
Courtesy of BIG

Also part of the plan is the removal of the Hirshhorn Museum and Sculpture Garden’s “incarcerating” concrete wall that blocks direct access to and from the National Mall. In addition to this, more exhibition space will be added beneath the garden to accommodate large art installations. 

BIG Reveals 20-Year Restoration Plan for Washington DC's Smithsonian Campus - Image 13 of 38
Courtesy of BIG

When the Institution set out to find an architect for the campus overhaul, they were particularly concerned with preserving the site’s historic architecture. In response, BIG responded by “almost turning architecture into an art of reinterpretation," says Igels. "What we tried to do with Smithsonian is reinterpret all of the qualities that are already there, and strengthen and enhance them, and maybe sometimes tweak them, but the point of departure is always the existing character that is there."

BIG Reveals 20-Year Restoration Plan for Washington DC's Smithsonian Campus - Image 19 of 38
Courtesy of BIG
BIG Reveals 20-Year Restoration Plan for Washington DC's Smithsonian Campus - Image 29 of 38
Courtesy of BIG
  • Architects

  • Location

    419 11th Street Northwest, Washington, DC 20004, United States
  • Partners in Charge

    Bjarke Ingels, Thomas Christoffersen
  • Project Manager

    Ziad Shehab
  • Project Leader

    Daniel Kidd, Sean Franklin
  • Design Team

    Suemin Jeon, Alana Goldweit, Cadence Bayley, Lina Bondarenko, Annette Miller, Otilia Pupezeanu, Choongyho Lee, Doug Stechschulte, Jeremy Alain Siegel, Alexandre Hamlyn, Julian Ocampo Salazar, Tammy Teng, Daisy Zhong
  • Collaborators

    SurfaceDesign, Robert Silman Associates, GHT Limited, EHT Traceries, Stantec, Atelier Ten VJ Associates, Wiles Mensch, PE Group, FDS Design Studio, Kleinfelder
  • Area

    123703.0 sqm
  • Project Year

    2034
  • Photographs

    Courtesy of BIG
  • Location

    419 11th Street Northwest, Washington, DC 20004, USA
  • Project Year

    2034
  • Photographs

    Courtesy of BIG
  • Area

    123703.0 m2

References: Smithsonian, BIG

Project gallery

See allShow less

Project location

Address:419 11th Street Northwest, Washington, DC 20004, United States

Click to open map
Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Cite: Karissa Rosenfield. "BIG Reveals 20-Year Restoration Plan for Washington DC's Smithsonian Campus" 13 Nov 2014. ArchDaily. Accessed . <https://www.archdaily.com/567471/big-reveals-20-year-restoration-plan-for-washington-dc-s-smithsonian-campus> ISSN 0719-8884

You've started following your first account!

Did you know?

You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.